Cement plant administrative building — Biskra

Biskria Ciment cement plant in Biskra wilaya
Role
Design, supply and installation
Levels
7
Cars
Fire-resistant laminate
Doors
Flame-proof stainless steel

With a capacity of 2.7 million tonnes per year, this latest-generation cement plant completes Algeria’s industrial capacity. It is equipped with the largest vertical cement mill in the world.

The result of a partnership between the Souakri Group and LafargeHolcim, the world leader in building materials, the project mobilised more than 35 billion DZD of investment and created 600 jobs. An administrative building spreads the various departments over several levels.

High-performance lifts

At the heart of the building, KMY-brand units carry Algerian and foreign staff every day. Fitted with a machine room at the top, they are subjected to very high temperatures throughout the summer.

KMY Ascenseurs supplied and installed the units, from design to commissioning. The quality of the components determines here whether performance is maintained: without it, access to the building’s 7 levels quickly deteriorates.

A building under constraints

At the gates of the Sahara, the site endures very high temperatures for several months a year, which requires complex, energy-hungry air conditioning. The administrative building is nonetheless exemplary in its drive to reduce its environmental footprint, with comparative energy savings of more than 35 %.

The choice of lift materials stems from this requirement: making the building as high-performing as it is safe, with optimal accessibility for visitors and staff alike.

Fire safety to the fore

The car walls are made of fire-resistant laminate, hard to ignite, compliant with German and French fire reaction classes. The stainless steel doors are flame-proof and flame-tight: they prevent spread through the shaft and provide thermal insulation that limits the temperature rise in the car.

  • Sensor in the machine room protecting the components in case of extreme temperature.
  • Backup battery ensuring return to floor and door opening during a power cut.
  • Inspection of all devices by an approved body.

These arrangements were defined in close collaboration with the site’s technical teams, for whom a unit being out of service directly disrupts the running of the administration.